Posts

Showing posts with the label kitchen

We have Running Water!!!!!

Image
So we finally got the sink put in and hooked up so that I can now do dishes, you dont know how excited I was. We also got the upper cabinets put up but we still need to put the doors on, but that isn't a big deal, which means my kitchen is done, and my goal was to have it all done by the time I was 10 weeks and we finished right on time. Doesnt it look sooo great? Then on my birthday, I told Correy that I really just wanted to get the living room painted and ready for carpeting, so Correy started moving furniture and I cleaned up the place. As soon as it was ready we headed into town to get primer, and the nursery's paint, since I had a 5 dollar off coupon that was about to expire. And when we were checking out the guy at the cash register, ended up giving us 15 dollars off which was super sweet. When we got home, we decided to primer since it would have all night to dry and both Correy and I had Memorial Day off to finish up painting. Correy and I ended up sleeping in till 1:3...

The Kitchen is Almost Finished!!!!!

Image
So we finally got the cabinets done, we bought a used set then sanded them down and refinished them. It was alot of work but totally worth it. We ended up buying countertop that was on clearance at Lowes and I think it looks really good. Since these pictures were taken we added shelves on the right side for appliances. All that is left to do is put in the sink, which we just bought and finish the two upper cabinets that we have and the kitchen will be fully functional. I cant wait hopefully only another week and we will be on to the next project of painting and carpeting.

Everything is Coming along Nicely

Image
So there was kind of a hault on finishing the basement but now things are getting done quickly. We have our stove hooked up and Correy put down wood flooring in thekitchen area. The wood looks amazing and now all we need is cabinets and I though that that would be a while since they can be costly but we found some that we should be picking up within the week and hopefully have them installed in two weeks. We are even getting a countertop and sink. And after that is installed, me kitchen will be complete. Then just carpeting around the wood and painting the walls and the whole living area will be complete hopefully 2 months tops. Then its onto the spare bedroom, which has alot of work to be done. I will give more details when we get to that point.

Finally getting around to updating everything

Image
So much has been going on and my time has been spent doing so much. So we are all moved in, well sort of, as much as we can right now. The bedroom is all unpacked and we have made one of the bedrooms into an office with our computers and printer and stuff. But also it has become out storage room with a bunch of our boxes, mainly kitchen stuff and memorabilia and craft things. Our kitchen consists of a fridge, microwave, conventional oven, small counter space and a bunch of boxes. Right now the search is on for cheap kitchen cabinets that we can find second hand. And then a dishwasher and a oven. The bathroom was the first thing we set up, with a new sink and counter space, which is great because our washer and dryer is right there and it makes folding clothes so much easier. See how beautiful. And under the counter where there is nothing in the picture I have put a basket for all of our cleaning supplies. We bought a greenish color of paint to paint the bathroom area, but first we hav...